Back to Support
Installer checking a glass shower door frame with a level before installation

A short pre-installation review can catch the most common planning problems before glass is moved or holes are drilled. Use the exact instructions for your selected AROJAY model as the final authority.

Before installation

  • Confirm the model: match the product family, size and finish to the order and packaging.
  • Measure again: record the finished width at the top, middle and bottom, plus the finished height.
  • Inspect the threshold: check that it is complete, clean and suitable for the model-specific mounting method.
  • Check the wall area: locate plumbing, wiring and structural support before drilling.
  • Map door movement: mark the swing or sliding path and check the vanity, toilet, towel bars and shower controls.
  • Plan glass handling: keep panels protected and arrange the handling support required by the installation instructions.
  • Read the full manual: verify required tools, hardware, seal placement and curing time before work starts.

Match the checklist to the door type

P01 pivot and J01 hinged doors need an unobstructed swing path. P02 requires clearance for its bifold movement. S01 and S03 sliding doors need their rails and guides positioned according to the model instructions. W01 is a fixed panel, so its mounting surface and planned wet-zone coverage are especially important.

Stop and verify when information is missing

Do not assume a universal threshold depth, wall tolerance, fastener location or silicone pattern. These requirements vary by model and installation surface. Pause if the applicable instructions are missing or the finished opening does not match the selected product information.

Start with the AROJAY installation planning page and the documentation supplied for the selected model.

Supporting shower enclosure view
Supporting bathroom planning view